Spiga

Video Conferencing - A Checklist

What do you wish to achieve?

  • Point to Point รขโ�ฌโ�� two locations only at any one time
  • Broadcast Live รขโ�ฌโ�� from one site to many รขโ�ฌโ�� watch and listen
  • Broadcast pre-recorded รขโ�ฌโ�� from one site to many รขโ�ฌโ�� watch & listen
  • Multipoint รขโ�ฌโ�� three or more sites with Q&A between any, relayed to all
  • Multipoint - three or more รขโ�ฌโ�� plus broadcast from any to satellite sub-groups as a watch and listen.
  • Live with session taped for future edit and distribution
  • Person to person/s with video & audio & data manipulation across participants รขโ�ฌโ�� e.g. sharing documents, drawings with or without live edit and audit of changes made.

    With whom do you wish to communicate by videoconferencing?

  • Only inside your company
  • From your company to sister/ contractor/ supplier companies
  • With your customers
  • With your prospects

    Frequency of system use

  • Ad hoc
  • Estimated use per annum (min/max)
  • Weekly
  • Monthly
  • Quarterly

    Installation type

  • Custom built static installation รขโ�ฌโ�� i.e. a designated room
  • Desktop location/s รขโ�ฌโ�� i.e. from the office desktop PC
  • Mobile "roll-about" system -
  • Off-site facilities required รขโ�ฌโ�� going to a dedicated videoconference facility

    Options required

  • Record, Edit & Distribute by hardcopy (CD/DVD)
  • Record, Edit & Distribute by softcopy (Web cast)
  • Broadcast live via direct links to named recipients/ groups
  • Broadcast pre-recorded across one or more time zones
  • Log who watched and listened and when
  • Multiple persons at One or Two (group to group videoconferencing รขโ�ฌโ�� e.g. design teams, board to local management)
  • Multiple participants at Three or more sites

    What are your current IT capabilities?

  • ISDN 1
  • ISDN 2
  • ISDN 30
  • LAN รขโ�ฌโ�� Cat5/ Cat5e/ Cat6
  • LAN รขโ�ฌโ�� Fibre
  • LAN รขโ�ฌโ�� wireless รขโ�ฌโ�� type?
  • WAN รขโ�ฌโ�� bandwidth?
  • VPN รขโ�ฌโ�� bandwidth?
  • Internet access, dial-up 56k
  • Internet access , Dial-up 128K
  • Internet access , Broadband 1Mb
  • Internet access , Broadband 2Mb
  • Internet access , Broadband 4 Mb
  • Internet access , Satellite link
  • Internet access , permanent fibre/ cable link
  • T1 / T2 / T3 / T4 (aka DS-1/ DS-2/ DS-3/ DS-4)
  • OC-1 / OC-3 / OC-12 / OC-38

    Impact on your system รขโ�ฌโ�� to be considered

  • Bandwidth load
  • Current capacity used & unused & reserved (max/ min for each)
  • Planned bandwidth use รขโ�ฌโ�� excluding video conferencing
  • Contention ratio
  • Speed
  • Video quality รขโ�ฌโ�� predominantly static (talking head รขโ�ฌโ�� Yes/No)
  • Hardware at point of display
  • Hardware at point of transmission
  • Hardware at point of distribution

    Points to consider

  • Budget
  • What do you spend currently on flights/ travel/ accommodation per annum?
  • Write-off period for cap ex
  • Leasing options
  • IT infrastructure
  • Cost and timescale of increased capacity and hardware -if required

James Hunter works for Status AV, a premier provider of video conferencing solutions in the UK.

0 comments: